Civil Services
Richmond, IN

Chester Boulevard Interceptor
Richmond Sanitary District
Richmond, Indiana

 

This project was undertaken to provide additional sewer capacity for the North Richmond and Chester Boulevard Sanitary Basins. The existing interceptor was approaching capacity due to rapid growth as well as the relocation of Reid Hospital, resulting in several surcharging events.

Capacity requirements for the drainage basin, alternative routes and configurations of sewers, lift stations, and force mains were investigated to address the problem.

Donohue developed five design alternatives, each with different combinations of new and upgraded sewers and upgraded lift stations. The selected alternative incorporates a comprehensive gravity system which eliminated the need for four existing lift stations.

The design includes 14,000 feet of interceptor sewers, of which 2,600 feet are aerial sewers and 1000 feet are deep sewers. This alternative provides the lowest long-term operational costs and reduces the impacts on traffic and property owners.

 

close window